Manufacturing and Assembly of FRP Spool

Manufacturing and assembly of FRP spool (fiberglass reinforced pipe) for the LĂ­nea Dura project, located in La Negra, Antofagasta, Chile. The manufacturing and assembly of the FRP spool was carried out in a professional and efficient manner, following established standards and procedures. The system is in satisfactory operation, meeting the project objectives.Drawing of the isometric plan:A detailed isometric drawing of the FRP spool was prepared, including dimensions, technical specifications and location of the components.Spool manufacturing:The…

Continue ReadingManufacturing and Assembly of FRP Spool

Metal structure, FRP hood and drum filter assembly

Fabricación de estructura metálica, campana FRP y montaje filtro tambor 1 Descripción del proyecto:El presente proyecto tiene como objetivo la fabricación y montaje de estructura metálica y campana FRP con conexión al ducto de 20”. Especificaciones técnicas:Material campana: FRP (Fibra de vidrio reforzada con plástico)Dimensiones:Diámetro: 4000x6710mmEspesor: 12 mmAcabado:Superficie externa: Lisa color blancoResistencia química: AltaResistencia a la temperatura: -40°C a +80°C Accesorios:1 Flanges de salida de 20”

Continue ReadingMetal structure, FRP hood and drum filter assembly

Air Swepers Installation

Installation of air sweepers in thermal system ductsLocation: La Negra, Antofagasta, ChileAim:Install stainless steel thread with Balsona 1111 application and FRP coating with white finish paint for the installation of air sweepers in Terma system ducts.Scope of work:Supply and installation of stainless steel threads and structural reinforcement in the Terma system ducts.Application of Balsona 1111.Coating with fiberglass reinforced polymer materials – FRP.Application of sealant and UV protector with white gel coat.Materials:AISI 316 stainless steel threadBelsona…

Continue ReadingAir Swepers Installation