Manufacturing and Assembly of FRP Spool

Manufacturing and assembly of FRP spool (fiberglass reinforced pipe) for the Línea Dura project, located in La Negra, Antofagasta, Chile. The manufacturing and assembly of the FRP spool was carried out in a professional and efficient manner, following established standards and procedures. The system is in satisfactory operation, meeting the project objectives.Drawing of the isometric plan:A detailed isometric drawing of the FRP spool was prepared, including dimensions, technical specifications and location of the components.Spool manufacturing:The…

Continue ReadingManufacturing and Assembly of FRP Spool

Metal structure, FRP hood and drum filter assembly

Fabricación de estructura metálica, campana FRP y montaje filtro tambor 1 Descripción del proyecto:El presente proyecto tiene como objetivo la fabricación y montaje de estructura metálica y campana FRP con conexión al ducto de 20”. Especificaciones técnicas:Material campana: FRP (Fibra de vidrio reforzada con plástico)Dimensiones:Diámetro: 4000x6710mmEspesor: 12 mmAcabado:Superficie externa: Lisa color blancoResistencia química: AltaResistencia a la temperatura: -40°C a +80°C Accesorios:1 Flanges de salida de 20”

Continue ReadingMetal structure, FRP hood and drum filter assembly

Air Swepers Installation

Installation of air sweepers in thermal system ductsLocation: La Negra, Antofagasta, ChileAim:Install stainless steel thread with Balsona 1111 application and FRP coating with white finish paint for the installation of air sweepers in Terma system ducts.Scope of work:Supply and installation of stainless steel threads and structural reinforcement in the Terma system ducts.Application of Balsona 1111.Coating with fiberglass reinforced polymer materials – FRP.Application of sealant and UV protector with white gel coat.Materials:AISI 316 stainless steel threadBelsona…

Continue ReadingAir Swepers Installation

End of content

No more pages to load